Production of this torque arm bracket previously required 8-10 hours of fabrication per part. The conversion to a ductile iron casting led to shorter lead times for the customer and eliminated 50 in. of welding. An overall cost savings of $49 per part was achieved. Supplied by Farrar Corp., Manhattan, Kan.